Fire Station #12, London, ON

OWNER

City of London

PROJECT COST

$2.7 Million

ARCHITECT

Murphy & Murphy Architects Inc.

Fire Station #12, London, ON

This project was completed with rave reviews and was a winner of a City of London Urban Design Award.

 

The building was constructed of a pre-cast concrete roof on load bearing masonry walls.  The apparatus bay is constructed of steel trusses on steel columns.  Masonry brick over the apparatus bay doors proved to be a challenge, but was designed economically keeping the overall costs on budget.

CONTRACTOR

Southside Group

COMPLETION

2002