Fire Station #5, London, ON

OWNER

City of London

PROJECT COST

$1.0 Million

ARCHITECT

architects Tillmann Ruth Mocellin Inc.

Fire Station #5, London, ON

This project concluded in 1998 and was completed on budget.

 

The building was constructed as a wood framed structure. The apparatus bay was constructed as plywood sheathing on wood joists with the ends of the joists bearing on parallam wood trusses (shown above).

 

The living quarters were constructed of pre-engineered wood trusses bearing on wood stud walls.

CONTRACTOR

Tonda Construction

COMPLETION

1998

BE IN 