Maitland River Public School, Wingham, ON

OWNER

Avon Maitland District School Board

PROJECT COST

$8.3 Million

ARCHITECT

Marklevitz Architect

CONTRACTOR

Maitland River Public School, Wingham, ON

The elementary school in Wingham Ontario was constructed to replace the existing facility and amalgamation of other schools, and was opened in 2013. 

 

The building features a double gymnasium, a cafeteria/auditorium, library and a large open atrium at the front entrance. The structure has been designed to accommodate a future addition adjacent to this building.

 

The building was constructed using precast concrete planks on load bearing masonry for a majority of the structure. This type of construction is found typically in the classroom areas.  The centre core corridor, the multi-purpose room and library is constructed using glulam beams with acoustic deck.  The gymnasium is constructed using acoustic deck and steel joists.

Devlan Construction

COMPLETION

2013

BE IN 
TOUCH

London Office:

458 Queens Ave, London, ON N6B 1X9 

Tel: 519-433-4661 E-Mail: vbands@vbands.com

Niagara Falls Office:

4082 Portage Rd, Unit 1, Niagara Falls, ON L2E 6A3

Tel: 905-357-2030  E-Mail: al@vbands.com

  • Instagram
  • Twitter
  • Facebook
  • LinkedIn